Skip to main content
For textile mills and garment factories

Stop re-typing your factory into someone else’s spreadsheet.

The plant in one sentence.

vertex.traceloom.covertex.traceloom.co · demo Live · synced 02:14 ago
TodayInternal Mill

Yesterday: $1.6K in energy for 3,173 yds. Delivery is 1.1 points behind plan, and the order book holds 310,873 yds.

synced 27 Sep · daily report + meters

● 02 · The cost of the current way

The data already exists. Your people are just moving it by hand.

Every buyer request, every audit pack and every monthly report gets rebuilt from the same ERP exports and utility bills, by the same three people, over and over. Nothing is wrong with the data. The retrieval is the cost.

Every month

Re-keying the energy bill.

Into a spreadsheet that already holds last month’s, so the number can be compared against a meter nobody read.

Every RFQ

Rebuilding the buyer deck.

The same certifications, the same capacity, the same photos, assembled again by the sales team for every enquiry.

Every shipment

Chasing the quality breakdown.

Because the grade split lives with the QC supervisor and the shipment record lives with commercial.

● 03 · How it works

Three steps. We do two of them.

TraceLoom connects to what is already running in your building. You do not replace your ERP, retrain your floor, or hire anyone.

Step 01We do this

We connect your meters and your ERP.

Direct feed where your system allows it, a dropped export or utility bill where it does not. Our team does this part.

Step 02We do this

Everything lands in one record.

Orders, output by section, energy by meter, and the quality grade on every delivery, all reading from the same row.

Step 03You do this

You open one screen before the shift starts.

Current before anyone arrives. Your buyer sees the shipment record on the same numbers, without asking you for it.

First meter to full rollout: four to eight weeks. No change to your ERP.

● 04 · What you get

Four things it does the day you go live.

TodayInternal Mill

Yesterday: $1.6K in energy for 3,173 yds. Delivery is 1.1 points behind plan, and the order book holds 310,873 yds.

synced 27 Sep · daily report + meters

The floor

One screen your MD, floor managers and sales team all work from.

Orders open into their production runs and their delivery challans, with the quality grade on each one. Refreshed daily off your own meters, before the day starts.

See it in the tour
Digital product passportBrand Shared
VTX-CSH-220 · Roll R-1207 · Chalan 30574463.8 kg CO2e

Cashmere Blend 220gsm · 50% Cashmere, 50% Merino · 1.36 kg/yd

Grade AReadyPublishedProduced 18 September 2026
The buyer

Every shipment leaves with its record already attached.

Fibre composition, quality verdict, first-quality percentage and the CO2e for those yards. Generated from the delivery itself, so it exists before anyone asks.

See it in the tour
WEFT leverInternal Mill
Idle generator G2 in the Sunday maintenance window~$1,270/mo

Generator G2 logged 6.4 h of runtime last Sunday against a 1.2 h baseline, with no production scheduled in the maintenance window. Ask the weekend shift lead to keep G2 offline Sunday 06:00 to 18:00. Grid and captive solar already cover the standby load.

High confidenceActed onDismissSnooze 7d
The money

It finds cost you are not looking for.

After about a month of data, TraceLoom ranks the handful of actions worth taking and prices each one. Ten days later it re-reads the meters and tells you whether the saving landed.

See it in the tour
Live profileBrand Shared
Public URL/v/vertex-textiles
Versions published14 · Sep 21, 2026, 09:12 AM
1 saved change is not published yet.

Tagline
Turkish wool & technical fabric, verified mill to mall.
Turkish wool and technical fabric, verified from mill to mall.

The paperwork

Audit packs and buyer surveys stop being a project.

Certifications, renewal dates and evidence sit against the records they came from. Export any figure with its source document attached.

See it in the tour
● 05 · In production

One factory, every source, nothing hand-keyed.

Argon Denims Limited, a denim fabric mill, runs TraceLoom across dyeing, weaving and finishing.

Established
2006
Looms
111 air-jet
Capacity
About 18 million yards a year
Listed
Dhaka Stock Exchange
Location
Sreepur, Gazipur

Every source was connected by hand once, over about two weeks of learning their ERP and their database. Nothing has been hand-keyed since.

Read the rollout
Buyer contracts increasingly name CSRD, CSDDD and a Digital Product Passport requirement, with DPP enforcement expected around 2028. When that clause reaches your contract, the data is already being collected, because it falls out of the system you run the floor on. The rules are not final, so this is readiness, not a certificate.

Buying from factories rather than running one? See TraceLoom for brands

Reads from

  • Oracle ERP, others scoped per customer
  • Utility bills and meter exports
  • Generator, boiler and compressor logs
  • Packing lists and delivery challans
Kickoff to live4 to 8 weeks
Reads fromMeters and ERP
Per shipmentOne passport
● 06 · The argument

The better you run, the harder you are to replace.

Brands keep working with the suppliers whose record they can see. TraceLoom turns that record into a live link instead of a quarterly deck, and keeps it current without anyone maintaining it.

● Get started

Plug in your meters.
We will do the rest.

Twenty minutes, on your own numbers rather than a canned tour. If it is not a fit we will say so in the first five minutes.

  • Nothing to install
  • No change to your ERP
  • No credit card, there is nothing to buy on this call

Request a walkthrough

GMT+6 Dhaka

We reply within one working day, Dhaka hours, with two or three times that suit your shift.

Prefer not to book a slot?